What the Construction Cost Calculator does
The Construction Cost Calculator works out estimated total, base cost and contingency from built-up area, cost per unit area (your quote) and contingency (%). Concrete, bricks, paint, flooring and area estimates for building and renovation jobs.
It runs in your browser and nothing you type is uploaded.
Before you start
You need 3 values and may add 1 optional one:
- Built-up area: A number: greater than zero.
- Cost per unit area (your quote): A number: zero or more.
- Contingency (%): A number: between 0 and 100.
- Other costs (optional): A number: zero or more.
Step by step
- Open the Construction Cost Calculator.
- Enter Built-up area.
- Enter Cost per unit area (your quote).
- Enter Contingency (%).
- Add other costs if you want it included, or leave it empty.
- Press Calculate. Every field that needs fixing is listed next to it.
- Read the main result first, then the other lines. Open Formula and assumptions to see how it was worked out.
- Use Copy to keep the result, and add the calculator to your favourites if you use it often.
A worked example
With these sample values (they are only an illustration; use your own):
| Built-up area | 10 |
|---|---|
| Cost per unit area (your quote) | 150 |
| Contingency (%) | 10 |
| Other costs (optional) | 100000 |
the calculator gives:
| Estimated total | PKR 101,650.00 |
|---|---|
| Base cost | PKR 1,500.00 |
| Contingency | PKR 150.00 |
Money is shown with PKR as the currency label (you can change it in the calculator settings). The example is the real output of this calculator.
Reading your result
The result lists: estimated total, base cost and contingency.
The formula it uses:
area × rate × (1 + contingency) + other
- The rate is your own quote: no market rate is assumed.
Common mistakes
- Use the same units for every value.
- Enter rates as a percentage per period shown in the label, for example 12 for 12%, not 0.12.
- Optional fields can stay empty. Required fields cannot.
- Treat the result as an estimate: real quotes, rules and rounding can differ.